Line 5

Line 5 Condos at Yonge & Eglinton by Reserve Properties & Westdale Properties is located at 117 Broadway Avenue in Toronto. Line 5 Condos will be architected by IBI Group and the interior design by U31. The major intersection is Yonge Street and Eglinton Avenue East.

Line 5 Condos will be the first phase of Yonge and Eglinton’s master-planned community. The first tower will have 36 storeys with a total of 504 units joining amenities. Second tower will be released at a later date. Units will be a mix of one bedroom, one bedroom plus den, and two bedroom units. Units starting from the $300’s. Line 5 Condos is estimated to be completed for September 2022.

Line 5 Condos will feature:

  • Social-club (co-working space during the day)
  • Café in the lobby
  • Dedicated lane for Uber and Lyft.
  • Ground floor amenities will include: fitness studio, outdoor yoga & Zen garden, pet spa, stretch & yoga studio, interactive training studio, personal training studio, steam & sauna room, and spa lounge.
  • 7th floor amenities include: outdoor BBQ, party & dining lounge, catering kitchen, outdoor theatre, outdoor fireplace lounge, and art studio.
  • 9th floor amenities include: outdoor pool, games & library lounge, and the Social Club.

Line 5 Condos Highlights:

  • Has a walkscore of 90/100
  • Located in the Mount Pleasant West neighbourhood in Toronto
  • 12 minute walk to the Eglinton Station
  • Short commute to Downtown Toronto
  • Close to shops, restaurants, and schools
  • Has an excellent transit score
  • Nearby parks include Blythwood Ravine Park, Sherwood Park and St. Clements-Yonge Parkette

Project Summary

Development Name: Line 5 Condos at Yonge & Eglinton

Developer (s):  Reserve Properties & Westdale Properties

Project Type: Condominiums

Location: Yonge & Eglinton – 117 Broadway Ave, Toronto, ON, M4P 1T7

Number of Floors: 28, 36 storeys

Number of Units: 949 units

Unit size: From 347 SqFt Up To 926 SqFt

Maintenance Fee: $0.58 Per SqFt Per Month

Price Range: Fill Form Below For Details

Date of completion: September 2022